Installation & Exhibition · 2026
PTE26 Amia Tower
- Affiliation
- ZHA
- Location
- EXCEL, London, UK
- My role
- Fabrication, Onsite
- Credits
- Design ZHA Architects Aviation Team Fabrication:TechLab-Justin Hanlan, JingWen Chiou Installation: SkylineWhiteSpace, TechLab
ZHAviation Tower is a six-metre-tall installation developed by ZHA Architects' Aviation Team for Passenger Terminal Expo 2026 in London, with TechLab responsible for digital fabrication and production. The installation was adapted from an earlier air traffic control tower design proposal, scaled down to approximately 1:10 while preserving its distinctive vertical fins and key geometric features.
The tower consists of seven modular levels, comprising fourteen main panels and a top section, totalling fifteen 3D-printed components. Although TechLab's robotic printing system is capable of producing elements over three metres tall, the components were deliberately divided into smaller sections, each weighing approximately 8–15 kg. This strategy was driven not only by transportation and handling requirements, but also by the need to provide sufficient access for installers to reach inside each panel and integrate LED lighting strips.
All panels were fabricated using B1 fire-rated recycled PETG through large-scale robotic 3D printing with WASP HDP XL extrusion systems. The production involved approximately 270 hours of printing and utilised TechLab's second robotic arm, supported by an expanded WASP CEREBRO control system to enable a dual-robot fabrication workflow.
For structural support and assembly, the installation uses an internal aluminium truss system, commonly found in stage and event construction. A custom clip-on connection system allows the printed panels to be attached directly to the truss, simplifying alignment between components and the supporting structure. This significantly improved installation efficiency while allowing the tower to be dismantled, transported and potentially reused at future exhibitions.
By integrating geometric adaptation, robotic additive manufacturing, modular design, lighting accessibility and a demountable structural system, the project demonstrates how digital fabrication can translate architectural concepts into buildable installations while addressing practical constraints of manufacturing, handling and on-site assembly.